Projects

THE ESTABLISHMENT OF A TWO (2) WING (20,000MT EACH), PETROLEUM STORAGE TERMINAL

PROJECT – THE ESTABLISHMENT OF A TWO (2) WING (20,000MT EACH), PETROLEUM STORAGE TERMINAL
CLIENTS – PETROLEUM PROJECT PARTNERS / FIRST BANK NIGERIA
PLC / PETROLEUM PROJECT PARTNERS & DANIUM ENERGY LIMITED / STERLING BANK PLC
COST – CONFIDENTIAL
ROLE – LENDER’S ENGINEER & PROJECT MANAGERS
LOCATION – ORON, AKWA IBOM STATE, NIGERIA
DATE – MAY 2014 – 2016
STATUS – COMPLETED

This project refers to the establishment of a two wing oil storage terminal, at Oron, Akwa Ibom State, Nigeria for a consortium that comprises; Petroleum Project Partners and Danium Energy Limited, with funding from First Bank Nigeria PLC and Sterling Bank PLC. Energy Culture’s job description in this project centers within the context of project development, subcontractor coordination, and technical advisory to the project consortium.

The entire project is seen through concept to completion and the contractual components consist of; (i) Erection and welding of steel tanks (product, water & foam) and laying of a pipeline network to connect all sections of the facility, (ii) Installation of pumps, metering, and instrumentation components, (iii) Construction of a complete loading gantry section, (iv) Installation and fitting of a foam pourer system and other firefighting apparatus, (v) Installation of electrical and plumbing fittings and (vi) Construction of an office building and other civil work-related structures and (vii) Construction of a complete jetty infrastructure, equipped with fenders, mooring guides, and bollard systems.