Projects

ESTABLISHMENT OF A FULLY AUTOMATED LIQUEFIED PETROLEUM GAS (LPG) TERMINAL IN WARRI, DELTA STATE

PROJECT – ESTABLISHMENT OF A FULLY AUTOMATED LIQUEFIED PETROLEUM GAS (LPG) TERMINAL IN WARRI, DELTA STATE.
CLIENTS – AYM SHAFA LIMITED
COST – CONFIDENTIAL
ROLE – PROJECT MANAGER / TECHNICAL CONSULTANT
LOCATION – IFIEKORO COMMUNITY, WARRI SOUTH L.G.A
DATE – DECEMBER 2018 – TILL DATE
STATUS – ONGOING

This project refers to the establishment of a fully automated LPG storage terminal, comprising of two (2) 5,000m3 LPG Spherical Tanks, Loading Gantry, Buildings, and Sheds, Tank Foundations and all Civil works, Firefighting Equipment, Program Logic Controls (PLC), Motor Control Centre (MCC), Pipeline Infrastructure, Instruments and controls (pumps, compressors, meters, valves, etc) and all other ancillary fittings.

The facility will be equipped with water and foam firefighting systems and all the necessary structural apparatus. All loading and discharge operations will be automated and capable of being controlled remotely. Energy Culture’s scope of work in this project includes the planning, monitoring, and supervision of the project work.