Projects

LENDER’S ENGINEER / TECHNICAL ADVISER ON THE CONSTRUCTION OF A 60 MILLION LITRE PETROLEUM STORAGE FACILITY

PROJECT – LENDER’S ENGINEER / TECHNICAL ADVISER ON THE REFURBISHMENT OF THE BONNY & FORCADOS TERMINAL
LOCATION – BONNY & ESCRAVOS TERMINALS
COST – CONFIDENTIAL
ROLE – LENDER’S ENGINEER
CLIENTS – BAYWOOD CONTINENTAL LIMITED / HERITAGE BANK
DATE – FEB 2016 – TILL DATE
STATUS – ON-GOING

This project refers to the refurbishment of 8 Forcados Terminal Storage tanks and 8 Bonny Terminal Storage tanks for Shell Petroleum Development Company (SPDC) by Baywood Continental Limited.

Energy Culture’s scope of work in this project is to provide project monitoring and supervision services while the refurbishment works take place. The activities to be monitored on both sites range from the examination of steel tanks to the removal of steel sheets, replacement, erection, and welding.

The project requires a very precise execution strategy due to the critical nature of the assets and scheduling requirements of SPDC. Upon completion, the project will support additional crude oil holding for SPDC
and other Joint Venture Partners in the Oil upstream industry in Nigeria.